The Incheon New Port development project has been ongoing in the sea acing the Songdo International City in the Incheon Free Economic Zone since 2009. The project aims to promote Incheon Port as a Pan Yellow Sea hub port through the construction of container terminals that are in keeping with the trend for larger container vessels.
Terminal Data
Category | HJIT | SNCT |
---|---|---|
Berth Length | 800m | 800m |
Dock Water Level | DL (-)16m | DL (-)16m |
Seaway Water Level | ~2017: DL (-)14m、2017~: DL (-)16m | |
Terminal Area | 480,000㎡(800m×600m) | 480,000㎡(800m×600m) |
Freezing Plug | 566 | 720 |
Dangerous Article Shed | 3,562㎡ | 4,690㎡ |
CFS/CIS | 5,443㎡ | 6,001㎡ |
Gate | 10Lane | 9Lane |
Temporary Equipment Ability | 43,590TEU | 36,390TEU |
Annual Handling Capacity | 1,200,000TEU | 1,200,000TEU |